Sample Development

Turn Your Design Concept Into a Production-Ready Sample
Before mass production, we transform your ideas, sketches, or reference images into a physical jewelry sample.
Our development process includes:
✓ Design evaluation
✓ CAD/3D confirmation
✓ Material selection
✓ Surface finish confirmation
✓ Sample production
✓ Quality review
Lead Time
7–15 Working Days
Depending on:
- Product structure
- Manufacturing process
- Material selection
- Surface treatment
Suitable For:
- New jewelry collections
- Custom designs
- Brand product development
- Market testing
Trial Production
Validate Production Process Before Scaling Up
Trial production helps confirm that the approved sample can be reproduced consistently.
During this stage, we verify:
✓ Manufacturing process
✓ Production parameters
✓ Assembly methods
✓ Surface finishing
✓ Quality standards
Lead Time
7–15 Working Days
Purpose:
Reduce production risks before entering bulk manufacturing.

Bulk Production

Stable Manufacturing for Volume Orders
After sample approval, production moves into the manufacturing stage.
Our production workflow includes:
- Material preparation
- Forming / Casting
- Polissage
- Plating
- Assemblage
- Final inspection
Lead Time
15–25 Working Days
For standard production.
Complex designs may require additional time depending on:
- Quantity
- Craftsmanship
- Special finishing
Reorder Production
Faster Repeat Orders Through Production Experience
For repeat orders, previous production information helps shorten preparation time.
We maintain:
✓ Production records
✓ Approved samples
✓ CAD files
✓ Mold information
✓ Finishing specifications
This allows brands to reorder with better efficiency and consistency.
Lead Time
10–20 Working Days
Depending on:
- Product availability
- Order quantity
- Production schedule

Factors That Affect Jewelry Lead Time

Every Project Has Different Production Requirements
Lead time may vary depending on:
Product Design
Complex structures require more development time.
Examples:
- Stone setting
- Multiple components
- Custom molds
Material & Finish
Different materials and finishes influence production schedules.
Examples:
- Stainless steel
- Brass
- dépôt PVD
- Enamel
- Résine
Quantité commandée
Larger quantities require:
- Production planning
- Material preparation
- Additional inspection
Approval Speed
Fast confirmation of:
- CAD drawings
- Samples
- Packaging
helps keep projects on schedule.
Our Production Timeline
Design Confirmation
1-5 Days
Sample Development
7-15 Days
Trial Production
7-15 Days
Bulk Production
15-25 Days
Quality Inspection & Shipment
3-5 Days
Reorder
10-20 Days